Best Coast Epoxy Coatings can transform your garage or floor space through our unique Garage Floor Epoxy Solutions. While many are familiar with Epoxy Flooring, they may not realize the ease of application when they have a professional doing the process. Epoxy flooring is an adhesive made from a class of synthetic thermo setting polymers which creates a strong, long lasting chemical resistant bond against the original flooring (typically concrete).
Just as home or business decor or interior can vary per household, Epoxy is designed to customize your floor to the style or look which completes the space.
Don’t settle for bare concrete when your Epoxy Flooring can be customized into pearlescent metallic flooring, marble, faux wood, long lines or an assortment of designs incorporating artwork and imagery, or business and personal logos. Our professional staff is available to assist you with the options and choices for your needs and walk you through the process.
Commonly Asked Questions Before Installation:
Should I fill the expansion joints before my epoxy floor is installed?
No. It is against our recommendation to fill the joints (ever) as they are there to help avoid and prevent cracks. The joints help to absorb shock from the concrete expanding and contracting when heated or cooled.
How Big Is My Garage Floor?
Though final measurements are necessary before installation and custom homes can vary, the typical size for modern track homes is as follows:
2-car garage = 400 sq./ft. 3-car garage = 600 sq./ft. 4-car garage = 800 sq./ft.
Quotes provided in 30 minutes or less.
Our standard install is a 3-day process.
*1 day install can be accommodated if necessary for an up charge*
Day 1: consist of just a concrete preparation day. In most cases if the floor is bare concrete we will prep our floors with muriatic acid. This strips the top layer of the concrete and opens up the pours of the floor allowing the epoxy to penetrate into the floor and form a bond. If there is a coating that is currently on the concrete but is failing due to improper preparation, we will then use a diamond grinder to remove the coating before putting down our epoxy floor primer.
Day 2: we would come in and tape off the perimeter of the dry wall and put down our first coat of epoxy (water based primer). Once that dries (typically 30 minutes or so) we would then lay the second coat of epoxy which is 100 % solids (the thickest most durable epoxy) and broadcast the decorative chips into that coat as well.
Day 3: we would come back and pull the tape, collect the loose chips and roll on our final coat, which is a poly urethane top coat.
The day after install is complete (day 4) you can begin to walk on the floor and start moving stuff back into the garage. However, it is 7 days before you can drive a vehicle back on the floor (7 days is complete cure time for the 100 % solids epoxy).
Typically, garage square footage is as follows: *This is mostly true for track homes, custom homes tend to have extra storage space which create additional square footage.*
2-car garage = 400 sq./ft.
3-car garage = 600 sq./ft.
4-car garage = 800 sq./ft.
We accept all major credit cards, checks, cash and Paypal.
*Additional fees may occur when using credit cards/Paypal. *
The first thing that makes us succeed over our competitors is our unmatched customer service! We put the customer first and take pride in doing so.
2.) We use top of the line products and the strongest most durable epoxy (100 % solids). Most of our competitors are using a water based epoxy for their base coat which is thin and not durable what so ever.
3.) We provide a 10 year warranty on labor and installation on all of our epoxy floors.
Notify on stock availability